I have scheduled reports that run after we do our morning shipping that require updated inventory numbers. I have to manually run the Pipeline before that scheduled report runs so that the report is accurate. The schedule for this report is pointless if I have to login and run the pipeline before the report runs, I might as well run the report as soon as the pipeline loads since I'm logged in anyway. If I'm out of the office, then the scheduled report is useless because I didn't manually run the pipeline before the report ran. If I could schedule the pipeline to run 30 min before my scheduled report, that would solve my problem.
Hi Kristi,
Thanks for sending this suggestion along! We have a lot of plans around automation next year, including the ability to set schedules for pipeline runs, report runs, and having these things linked together. This way you could schedule a pipeline run and, when the pipeline completes, have it run a specific report or set of reports and send those out so that they have the latest data. I don't have a specific timeline for it but the hope is that it would be a 2025 enhancement.